The Building

The new way of working, at Tiller & Lock...

The scheme has been designed to provide the perfect environment to look after your team’s wellbeing – whilst actively promoting productivity.

Tiller reception

Step inside

The reception areas welcome occupiers and visitors into impressive and collaborative spaces, with lounge style seating and on-site coffee shop.

Shower and changing facilities at lower ground level, mean you can arrive with ease and start the day fresh. Simply step out of the new, remodelled Old Street station and into the building within six minutes.

Summary
specification

Unique branding opportunity for tenant of scale to rename the new public park

WiredScore Platinum Certification

Reception with coffee shop and breakout, Black Sheep coffee on site

Male and female changing facilities, showers & lockers

148 bicycle
spaces

Winter gardens and balconies on every floor

DALI control lighting system – PIR detection and daylight dimming

17 car parking spaces (3 with electric charging)

HVAC air conditioning system

New 150mm metal–tiled raised access floors

2.7m height – floor to underside of lighting

Exposed concrete ceilings and linear LED suspended lighting

Floor to ceiling glazing allowing for excellent natural light from every elevation

Occupational base build density 1:6 sq m

Tiller & Lock building exterior

Lock reception CGI

Tiller ground floor café

Tiller 3rd floor kitchen

On floor

Upstairs, three floors of versatile office space offer floor plates of up to c.24,000 sq ft.

Finished to a high standard with modern fittings, floor-to-ceiling windows and balconies on every floor, while the part third floor is available in CAT B condition.

1st and 2nd floor CAT A

Part 3rd floor
CAT B

Tailored fitted CAT B
solutions

Indicative floor